Construction Journal

Follow our journey from foundation to completion

Overall Progress

37.5%

Track the villa's construction progress and watch your future retreat take shape.

Construction Stages

Building Your Dream Villa

Site Setup
Site Setup
5%
Progress100%

Site clearance, welfare facilities, and temporary works completed.

Groundworks & Excavation - Image 1
Groundworks & Excavation
1 / 4
10%
Progress100%

Earthworks, drainage, and trenching completed successfully.

Foundations
Foundations
10%
Progress100%

Footings and concrete pours are nearly complete. Ground beams in progress.

Substructure / Slab - Image 1
Substructure / Slab
1 / 5
5%
Progress100%

Ground floor slab installation underway. Insulation and damp proofing in progress.

Superstructure (Walls, Frame, Roof) - Image 1
Superstructure (Walls, Frame, Roof)
1 / 4
25%
Progress30%

The formwork is complete and the first floor concrete pour is now taking Place. We are now starting to understand the breathtaking views from this incredible location. And this is the weather in December!

10%
Progress0%

Roof covering, render, cladding, windows and doors - upcoming phase.

10%
Progress0%

Stud walls, electrical, plumbing, and HVAC first fix - scheduled to begin soon.

10%
Progress0%

Plaster, joinery, tiling, and decorations - future phase.

10%
Progress0%

Electrical, plumbing, and heating second fix - future phase.

3%
Progress0%

Final painting, floor finishes, and systems testing - final phase.

2%
Progress0%

Paths, driveways, fencing, and planting - completion phase.

Construction Updates

1st floor concete pour underway
10/12/2025

1st floor concete pour underway

After meticulous preparation, the concrete pump is in place, and the first floor is being poured.

Structure
Preparation for 1st floor concrete pour
09/12/2025

Preparation for 1st floor concrete pour

Work is well underway, and progress is great for the first-floor concrete pour at Liberty Villas

Main Structure
Formwork preparation
06/12/2025

Formwork preparation

We are now at the stage where the formwork is being prepared for the first-floor pour. We are starting to be able to understand the amazing views fully. This will be the view through glass doors towards the sea from what will be the Kitchen.

Main Structure
Foundation Pour
23/11/2025

Foundation Pour

After building control sign-off, the foundation pour marks a crucial transition from groundworks to structural construction

Foundation Work Completing
03/11/2025

Foundation Work Completing

We are thrilled to announce that we are close to completing the foundation phase. The villa's structural base has been expertly laid, ensuring stability and longevity. Our engineering team has worked meticulously to create a foundation that will support this architectural masterpiece for generations.

Foundation Close to completion
Adding Mesh to Foundation Formwork
01/11/2025

Adding Mesh to Foundation Formwork

After constructing and levelling the outer formwork, the reinforcement mesh is placed inside on spacers to keep it elevated within the concrete. Once positioned, concrete is poured to fully encase the mesh before being levelled, finished, and left to cure.

Structural Foundations
Initial Foundation Base
28/10/2025

Initial Foundation Base

Concrete was pumped into the villa’s foundations to ensure a solid and even base across all sections. Once fully cured, the next step will be applying the hydro insulation to protect the structure from moisture ingress.

Foundation construction
Ground Work Started
23/10/2025

Ground Work Started

We're excited to share that groundwork has officially begun on the Liberty Villas project. The site has been carefully prepared, with excavation and initial earthworks now underway. This marks the first tangible step from vision to reality, as the groundwork team sets the stage for the structural foundation to follow. Breaking Ground

Breaking Ground